File #: 23-0367   
Type: Payment Ordinance Status: Adopted
Meeting Body: City Council Formal Meeting
On agenda: 3/22/2023 Final action: 3/22/2023
Title: Doege Development LLC

Title

Doege Development LLC

 

Description

For $447,864.84 in additional payment authority for Contract 154721 Change Order 3 for Phoenix Goodyear Airport Drainage Improvements Federal Aviation Administration (FAA)/Arizona Department of Transportation (ADOT) (AV41000074) project for the Aviation Department. This change order is necessary due to the discovery of unforeseen site conditions during the excavation for pipe. Since the Goodyear Airport facility was originally built before World War II and was owned by several entities, the as-built documentation for underground utilities and other unmarked communications lines were inaccurate. The existing east tie-in point for the 72-inch storm drain line was not per the drawings. A new structure for the tie-in point had to be designed and installed. This project uses Federal Funds. No General Funds are required. This change order will provide additional funds and time to the agreement.