File #: 17-1827   
Type: Ordinance-S Status: Adopted
Meeting Body: City Council Formal Meeting
On agenda: 5/10/2017 Final action: 5/10/2017
Title: Aquifer Storage and Recovery Well 303 Construction Manager at Risk Design Phase Services - WS85010051 (Ordinance S-43507)
District: District 2

Title

Aquifer Storage and Recovery Well 303 Construction Manager at Risk Design Phase Services - WS85010051 (Ordinance S-43507)

 

Description

Request to authorize the City Manager, or his designee, to enter into an agreement with MGC Contractors, Inc., (Phoenix) to provide Construction Manager at Risk (CMAR) Design Phase Services in support of the Aquifer Storage and Recovery (ASR) Well 303 project. Further request authorization for the City Controller to disburse all funds related to this item.

 

Report

Summary

ASR Well 303 is currently in design with drilling and construction scheduled for summer 2017. The expected production capacity is about 1,200 to 1,500 gallons per minute (gpm). Water pumped from the well will be used to supplement potable water deliveries in northeast Phoenix. During periods of low water demand, the City plans to store surplus potable water in the aquifer by injecting potable water down this well. The anticipated injection rate is 1,200 gpm with an objective of recharging 1,000 to 1,200 acre-feet per year (five to six months of recharge). The goal of recharge is to stabilize water levels in the northeast valley Phoenix aquifer.

 

This project will be to perform design services including the well pump and all associated piping necessary to connect it to the existing water distribution system, a de-chlorination system, the electrical components necessary for the well to operate, and the connection into the City’s Supervisory Control and Data Acquisition (SCADA) system so that it is fully automated.

 

MGC Contractors, Inc., will be responsible for means and methods relating to construction of the project and participating with the City in the local and Small Business Enterprise (SBE) goal setting process and implementing the SBE process. MGC Contractors, Inc., will be required to solicit bids from prequalified subcontractors to perform work under the City's subcontractor selection process. MGC Contractors, Inc., also may compete to self-perform limited amounts of work for this project. MGC Contractors, Inc., will assume the risk of delivering the project through a Guaranteed Maximum Price contract.

 

Procurement Information

MGC Contractors, Inc., was chosen for this project using a qualifications-based selection process according to Section 34-603 of the Arizona Revised Statutes (ARS). Pursuant to ARS Title 34, the City is not to release the scoring of proposers until a contract has been awarded. The top three rankings follow:

 

MGC Contractors, Inc.: Ranked #1

PCL Construction, Inc.: Ranked #2

Felix Construction Company: Ranked #3

 

Contract Term

The term of services is expected to be one year from issuance of the Notice to Proceed. Contract work scope identified and incorporated into the contract prior to the end of the contract term may be agreed to by the parties and work may extend past the termination of the contract. No additional contract work scope may be executed after the end of the contract term.

 

Financial Impact

MGC Contractors, Inc.’s fee under this contract will not exceed $42,178 including all subconsultant, subcontractor and reimbursable costs. Funding for these services is available in the Water Services Department’s Capital Improvement Program budget. Contract payments may be made up to the contract limits for all rendered contract services, which may extend past the contract termination.

 

Concurrence/Previous Council Action

The CMAR Construction Phase Services contract is being submitted for City Council approval simultaneously with this request for CMAR Design Phase Services.

 

Location

The well is near Cave Creek and Lone Mountain roads.

 

Department

Responsible Department

This item is submitted by Deputy City Managers Karen Peters and Mario Paniagua, the Water Services Department, and the City Engineer.