File #: 23-2422   
Type: Ordinance-S Status: Adopted
Meeting Body: City Council Formal Meeting
On agenda: 12/6/2023 Final action: 12/6/2023
Title: Citywide Mechanical and Plumbing Job Order Contracting Services - 4108JOC223 (Ordinance S-50362)
District: Citywide

Title

Citywide Mechanical and Plumbing Job Order Contracting Services - 4108JOC223 (Ordinance S-50362)

 

Description

Request to authorize the City Manager, or his designee, to enter into separate master agreements with the four contractors listed below to provide Citywide Mechanical and Plumbing Job Order Contracting (JOC) services. Further request to authorize execution of amendments to the agreements as necessary within the Council-approved expenditure authority as provided below, and for the City Controller to disburse all funds related to this item. The total fee for services will not exceed $80 million.

 

Additionally, request to authorize the City Manager, or his designee, to take all action as may be necessary or appropriate and to execute all design and construction agreements, licenses, permits, and requests for utility services relating to the development, design, and construction of the project. Such utility services include, but are not limited to: electrical, water, sewer, natural gas, telecommunications, cable television, railroads and other modes of transportation. Further request the City Council to grant an exception pursuant to Phoenix City Code 42-20 to authorize inclusion in the documents pertaining to this transaction of indemnification and assumption of liability provisions that otherwise should be prohibited by Phoenix City Code 42-18. This authorization excludes any transaction involving an interest in real property.

 

Report

Summary

The JOC contractors’ services will be used on an as-needed basis to provide Citywide Mechanical and Plumbing services for repair, replacement, and installation of HVAC systems and the components including: equipment, piping, domestic and site utility plumbing systems; natural gas piping systems; hot and cold domestic water piping systems; storm or rain water piping systems; hazardous production materials or chemical waste piping using stainless steel tubing polyvinylidene fluoride, polypropylene or other piping; plumbing fixtures; grease traps and interceptors; mixing valves, shut-off valves, water hammer arrestors, trap primers, freeze protection, anti-scald valves and expansion tanks; cooling tower fill replacement and chiller annual service; air handling units and vane axial supply fans; minor design services; and all other work incidental as it relates to this JOC. Additionally, the JOC contractors will be responsible for fulfilling Small Business Enterprise program requirements.

 

Procurement Information

The selections were made using a qualifications-based selection process set forth in section 34-604 of the Arizona Revised Statutes (A.R.S.). In accordance with A.R.S. section 34-604(H), the City may not publicly release information on proposals received or the scoring results until an agreement is awarded. Six firms submitted proposals and are listed below.

 

Selected Firms

Rank 1: Summa Mechanical Contractors, Inc.

Rank 2: HACI Service, LLC

Rank 3: Comfort Systems USA (Southwest), Inc.

Rank 4: RKS Plumbing & Mechanical, Inc.

 

Additional Proposers

Rank 5: Sun Eagle Corporation

Rank 6: Rainwater Plumbing, LLC

 

Contract Term

The term of each master agreement is for up to five years, or up to $20 million, whichever occurs first. Work scope identified and incorporated into the master agreement prior to the end of the term may be agreed to by the parties, and work may extend past the termination of the master agreement. No additional changes may be executed after the end of the term.

 

Financial Impact

The master agreement value for each of the JOC contractors will not exceed $20 million, including all subcontractor and reimbursable costs. The total fee for all services will not exceed $80 million.

 

Request to authorize the City Manager, or his designee, to execute job order agreements performed under these master agreements for up to $2 million each. In no event will any job order agreement exceed this limit without Council approval to increase the limit.

 

Funding is available in the Citywide Capital Improvement Program and/or Operating budgets. The Budget and Research Department will review and approve funding availability prior to issuance of any job order agreement. Payments may be made up to agreement limits for all rendered agreement services, which may extend past the agreement termination.

 

Department

Responsible Department

This item is submitted by Deputy City Manager Alan Stephenson, the Street Transportation Department and the City Engineer.